• <tt id="gjpx7"></tt>
    <video id="gjpx7"></video>
      1. <tt id="gjpx7"></tt>
        1. <strong id="gjpx7"></strong>
            咨詢服務 培訓服務
              肯達信服務熱線 CTS 統一客服電話
            400-690-0031
             
             
            首頁>咨詢服務>COSTCO驗廠咨詢
            COSTCO驗廠咨詢---COSTCO FACTORY EVALUATION之E部分

             

            E. IN-PROCESS QUALITY CONTROL


            1. Are all toolings fully tested and evaluated with all measurements and safety issues?

             

            2. Are samples of pilot run carefully be reviewed by engineers and quality staff to see all safety aspects are being met?

             

            3. Is IPQC sufficient to prepare for mass product?

             

            4. Is there any documentation either from the engineering, QC department, or top management to authorize mass production?

             

            5. Are there line patrols by quality controllers or other means to monitor the compliance of the product to meet quality and safety requirements?

             

            6. Does factory use international or clients standards to carry out in-process inspection? Are there records?

             

            7. Do records reflect the action taken on the rejected lots?

             

            8. Do records show rejected lots are well identified and segregated from accepted lots?

             

            9. Are rejected lots well-identified and segregated from accepted lots?

             

            10. Are there adequate, clearly written criteria/instructions available for  inspectors to follow?

             

            11. Are there adequate approved samples attached to all areas to give inspectors or workers a guideline?

             

            12. Is the inspection and test equipment sufficiently reliable to verify the conformance of the semi-finished final product?

             

            13. Is the testing equipment calibrated accurately and is it sufficient?

             

            14. Are the inspection defects charted, analyzed, and monitored to improve the problems encountered?


            15. Are shade batches separated in a lay while cutting?

             

             
             
             

             

            16. Are cutting panels checked before they are put into the sewing floor?

             

            17. Is there a tearing test for fused parts?

             

            18. Are cutting panels properly placed into containers / boxes?

             

            19. Are workers wearing protective gloves while they are operating cutting machines?


             
             
             
            Rating: In-Process Quality Control: Score 1 Point for each marked yes.

             


            Remarks:

            ______________________________________________________________________

            ______________________________________________________________________

            ______________________________________________________________________

            ______________________________________________________________________

             

            SA8000

            SA8000. 社會責任管理體系認證咨詢項目
            點擊查看

            WAL-MART

            WAL-MART. 沃爾瑪客戶驗廠咨詢項目
            點擊查看

            ISO20000認證咨詢

            ISO20000. IT服務管理體系國際標準認證咨詢介紹
            點擊查看
            客服中心
            楊老師
            王老師
            徐老師
            郭小姐
            張小姐
            陳老師
            您好,我是肯達信管理顧問公司客服,歡迎咨詢!

            楊老師

            您好,我是肯達信管理顧問公司客服,歡迎咨詢!

            王老師

            您好,我是肯達信管理顧問公司客服,歡迎咨詢!

            徐老師

            您好,我是肯達信管理顧問公司客服,歡迎咨詢!

            郭小姐

            您好,我是肯達信管理顧問公司客服,歡迎咨詢!

            張小姐

            您好,我是肯達信管理顧問公司客服,歡迎咨詢!

            陳小姐


            客戶服務熱線

            400-690-0031

            24小時熱線

            18576401396


            展開客服
            欧美日韩精品性行为视频